How to move a university department in seven phases

The seven phases of move management in higher education and a free four minute check against all of them.

Launch tool

Can your move fit inside the academic year?

In Higher Education, move management is the relocation of a department, laboratory, library or teaching space into temporary accommodation while works are carried out. It is governed by the academic calendar, because vacation periods, examinations, clearing and freshers week determine the windows in which a move can happen. Planning runs through seven phases, from bringing academic and professional services together to getting a business case through committee.

Decanting in a Higher Education setting

Vision Statement

The context

Move management is the planned relocation of a university function into temporary accommodation so that its permanent space can be refurbished, extended or replaced. It differs from a commercial office move in three respects: the windows are fixed by the academic calendar, the inventory is unusually varied, and teaching and research have to continue throughout.

values

Key facts

  • The academic calendar, not the building programme, sets the windows in which a university move can take place.
  • Specialist equipment lead times for decommissioning, calibration and recommissioning sit outside the estates programme and frequently set the critical path.
  • Re-timetabling to release capacity can remove the need for swing space entirely, and rests on measured utilisation rather than timetabled allocation.
  • A business case that misses an estates or finance committee cycle waits for the next one while the academic year continues.
Mission Statement

What are the seven phases of HE decants?

  • Bringing academic and professional services together: Establish a project board with academic leadership, registry, technical services, IT and student experience represented.
  • Fixing the move to the academic calendar: Map the move to named windows confirmed by registry, and protect examinations, clearing and welcome week.
  • Establishing what actually moves: Complete the inventory, including specialist equipment, collections and IT, with decommissioning and recommissioning lead times.
  • Exploring the options for swing space: Cover your own estate, other campuses, leased space and re-timetabling, and test each against timetabling capacity and student travel.
  • Protecting teaching and research continuity: Agree continuity programme by programme, including accreditation requirements and research funder commitments.
  • Costing and comparing the options: Cost swing space, the move itself, specialist equipment and the works on the same basis.
  • Preparing the business case: Set out benefits, risks and costs against the preferred option, aligned to a confirmed committee date.

Why is moving a university department difficult?

The windows do not move. Vacation periods, examinations, clearing and welcome week decide what is possible before any other consideration applies, and a programme that assumes a window registry has not confirmed will fail on that assumption alone.

University estates also hold an unusually varied inventory. Teaching rooms, offices, workshops, studios, collections and research equipment each move differently, and the lead times attached to specialist items sit outside the estates programme, so they tend to surface late unless they are looked for early.

Check your move against all seven phases

The Move Management Navigator asks two questions on each of the seven phases, plus four about the move itself. It takes four minutes and requires no preparation.

  • A phase by phase position across all seven, with what typically comes next.
  • Watch points specific to your scheme. These are based on what you are moving, for how long, and why.
  • A prioritised list of next steps and the questions to take to your next project board.

Four minutes. Sixteen questions. Nothing is stored in your browser and the summary is laid out to print straight into a board pack.

LAUNCH TOOL

More about the tool

People

Who is this tool for?

Directors and Heads of Estates, capital project leads, space managers and timetabling colleagues in universities planning a departmental, laboratory, library or teaching space move.

Expertise and Experience

How we work on moves

We work with universities across the UK on estate strategy, rationalisation and capital delivery. We advise on the option work and we deliver the move, and the connection between the two is what keeps a move inside an academic year.

Appraisals

Frequently asked questions

When is the best time to move a university department? The summer vacation is the widest window in the academic year, and it is also the one every other scheme in the capital programme wants. A winter or spring vacation is shorter, with examinations close behind it, which usually points to a phased move or a reduced inventory rather than a compressed version of a summer plan.

Can re-timetabling remove the need for swing space? Sometimes, and it is the option most often overlooked because it sits with timetabling rather than with estates. Whether it works depends on measured utilisation rather than timetabled allocation, which are different numbers. Where the evidence exists, it is usually the least disruptive answer available.

How do you move a laboratory without disrupting research? Start from the equipment schedule rather than the building programme. Decommissioning, calibration and recommissioning lead times frequently consume most of a vacation before anything is physically carried, and research continuity has to be agreed with named principal investigators, covering funder commitments and postgraduate researchers.

What happens if a move runs into term time? Teaching continuity becomes the binding constraint. Timetabling can absorb a great deal when it is involved while options are still open, and considerably less once dates are fixed, so the earlier timetabling colleagues join the project board the wider the options remain.